Hi guys, thanks for the warm welcome to the forum.
(Geoff, I found your site first, that was got me thinking seriously about this!)
I have some rather big news however. After checking out a couple of connections on Saturday, and tweaking my route, I did another run from Vauxhall yesterday (Monday 11th) and finished in a time of 2hours, 45 minutes, 11seconds!!!!!
I could hardly believe it! The first half was a dream, lots of jump on connections. The second half included another unplanned run in the South West corner, but I think it may have saved me some time. I had a "theoretical timing" sheet with me, and was expecting to get round in 3hrs 5mins. I got 20 minutes up at halfway, then with 4 trains to go, only had to do transfers within stations, so knew it should hold together. 3 trains to go: "Delays due to signal failures at Edgware Road" Thankfully I'd already cleared Edgware Road, but the final connections were not so good, and I was relieved not to have any major problems. I think that my longest wait was 3/4 minutes. I finished at Euston, by the way.
I kept a record of times in and out of stations, but didn't do anything like note down train numbers/get witnesses-is this expected on the Zone 1 Challenge Day? As a result, I have only my timing sheet as evidence
Also, I was wondering whether you have to do both Bank and monument as they are connected? I did them both this time, but I was wondering.
Needless to say, I'm even more enthusiastic about having a go at the whole challenge now, T4 or no T4. Bring it on!
All the best,
Ric